* 1. Top Rail 4” x 3” Tube * 4” x 4” Tube * 3/4 #9 Galvanized Expanded Metal * Formed Channel * Front: 3/16” Plate * Sides: 3/16” Plate Not Shown * Filter Floor: 3/16” Perf PLw/ 1/4" holes * Crossmembers 3 x 4.1 Channel 16 O.C * Hook: 1 1/4 PL * 6” Channel * Door Filter Panel
Options
* Removable Sump Liner * Galvanized Expanded Metal Side, * Front and Door Panels * 3/16” PLPeaked False Floor, 1/4” Hole, * 3/8 OC * 2" Drain Fitting with Ball Valve * 3" Overflow Coupling with Plug * 19 Cubic Yard Nominal Liner Capacity * 25 Cubic Yard Nominal Container Capacity * Side Rolling Tarp Installed, Optional
Roll-Off Equipment Skid
* Deck: 3/16” PL, 96" x 264" * Side Rail: 2” x 4” x 1/4” structural tubing * Cross Member: 3 x 4.1 channel 18" on center * Bottom Rail: 2” x 6” x 1/4” structural tubing * Wheel: (4) 10” DIAx 9” long wheels with grease fittings * Hoist Configuration: Standard cable with front hook and nose rollers * Front Stop Rack: 2 x 4 x 1/4 structural tubing 26" above deck; open in the center to clear the hook * Ramps: 42" longramp rack